About Us

From engineering roots to construction leadership.

Founded in Shiraz and built forward in Vancouver, Giva combines nearly 30 years of professional experience with practical, owner-minded project delivery.

The original Giva showroom and office in Shiraz, Iran
Our rootsThe original Giva showroom — Shiraz, IranEstablished by Ben Basirat and still operated by his family.

Ben Basirat — Founder & Principal

Turning difficult ideas into buildable results.

Giva's construction story began in Shiraz in 1999, when Ben started his first development—a five-storey, 13-unit residential building—and built a business spanning renovations, cabinetry, flooring, interior design and architectural coatings, including representing Jotun Paints. The original showroom remains active today under his brothers' management.

An Industrial Engineer specializing in Planning and Systems Analysis, Ben brings critical-path thinking, cost control and practical problem-solving to every project.

After moving to Vancouver in 2011, he expanded into residential renovation, commercial construction and specialized tenant improvements. Since 2015, Giva has delivered medical, dental, pharmacy, physiotherapy and wellness spaces across the Lower Mainland while advancing into multifamily development and construction management.

  • 1999Construction journey began
  • 2011Vancouver operations
  • 2015+Healthcare specialization
Talk with Giva

Our process

One clear sequence. Fewer disconnected decisions.

Every project is different, but the discipline is consistent: define it well, coordinate it early and manage it closely.

  1. 01

    Plan

    We clarify the property, goals, priorities and practical constraints before the work is defined.

  2. 02

    Coordinate

    Architectural, structural, mechanical and electrical requirements are brought into one working plan.

  3. 03

    Approve

    Drawings, permits, scope, pricing and procurement are organized for a confident start.

  4. 04

    Build

    Trades, schedule, site conditions and quality are actively managed throughout construction.

  5. 05

    Turn Over

    Final details, inspections and documentation are closed out for a smooth handover.